Running a central kitchen for three venues
Inventory, food cost & waste27 October 2026By The servearound team18 min read
When a central kitchen starts to pay for a group of three venues, what to make there and what to finish on site, and how to plan production, ordering, transfers and costs.

A central kitchen is one production kitchen that cooks for several venues. Stocks, sauces, doughs, braises and portioned proteins are made there in bulk, chilled, and sent out to the sites, which finish and plate them during service. For a group with three venues, it can be the difference between three kitchens each doing the same morning's prep and one team doing it once, properly, while the site kitchens concentrate on service.
It can also be an expensive mistake. A central kitchen adds rent, equipment, a vehicle, a second set of food safety procedures and a layer of ordering and paperwork that did not exist before. It changes what the chefs at each venue do all day, and not every chef thanks you for it.
This guide covers when a central kitchen starts to pay, what to make there and what to leave to the sites, and how to run the four things that decide whether it works: the kitchen production plan, internal ordering, the transfers between kitchens, and central kitchen costing. Every figure in it is an example.
What a central kitchen is, and what it is not
The terms vary. Some groups say central production unit, some say commissary kitchen, some say hub kitchen. The idea is the same: food is prepared in one place for consumption in several others, usually under cook-chill or cook-freeze, and the sites are supplied on a schedule.
It helps to separate three set-ups that are often lumped together:
- A dedicated central kitchen, in its own premises, with no dining room. Everything it makes leaves the building.
- A flagship venue whose kitchen also preps for its sister sites. It is cheaper to start, but production competes with the venue's own service for space, staff and fridges.
- A shared or rented production kitchen, used for a few days a week. It suits groups testing the idea before committing to a lease.
Most groups with three venues start with the second option and move to the first when the flagship kitchen starts to buckle. That is a reasonable path, as long as everybody knows that the flagship's kitchen now has two jobs and is resourced for both.
When a central kitchen starts to pay
The case for a central kitchen rests on a simple observation: three kitchens making the same sauces, stocks and bases every morning are paying three times for work that could be done once. Batch production uses labour more efficiently, makes better use of equipment that would otherwise sit idle, and produces a more consistent result.
The costs are just as concrete. A worked example for a group of three venues, with invented figures, shows how the sums come out.
Suppose each venue's kitchen spends about 25 hours a week on preparation that could move to a central kitchen: stocks, sauces, dough, braising, butchery and portioning. That is 75 hours a week across the group. In the central kitchen, working in batches with better equipment, the same output might take 45 hours, a saving of 30 hours a week. At an example cost of 18 an hour including on-costs, that is 540 a week, or about 28,000 a year.
Against that, the central kitchen might cost, in the same example, 20,000 a year in rent and running costs for a small unit, 6,000 a year for a van and its running costs, and a part-time driver at 9,000 a year. That is 35,000, more than the labour saving alone.
So in this example, labour savings do not pay for a central kitchen on their own. What tips the balance, when it tips, is usually some combination of the following:
- Less waste, because one kitchen produces to a combined forecast instead of three kitchens each making a little extra to be safe.
- Better buying, because one kitchen orders larger quantities from fewer suppliers.
- Consistency, which protects sales: the same dish tastes the same at every venue.
- Capacity at the sites. A site kitchen freed from three hours of morning prep can serve more covers in the same space, or open for lunch.
- Growth. The fourth and fifth venues cost far less to open when production already exists.
The honest test is to put numbers on each of those for your own group, with invented optimism taken out, before signing a lease.
Signs you need one, and signs you do not
A central kitchen tends to make sense when several of these are true:
- The venues share most of a menu, or at least share bases, sauces and prepared components.
- Site kitchens are short of space or fridge capacity, and prep is squeezing service.
- Consistency between venues is a complaint from guests or from you.
- The group plans to open more venues within a year or two.
- The venues are close enough together that a daily delivery takes an hour or two, not half a day.
It tends not to make sense when:
- Each venue has its own concept and its own menu, with little in common.
- The venues are far apart.
- The site kitchens are already lean and the prep they do is mostly last-minute and texture-sensitive.
- The group cannot yet afford a second set of food safety systems done properly.
If you are still at the stage of opening a second venue, our guide to what breaks first with a second venue covers the problems that usually come before a central kitchen is worth considering. The wider question of what to centralise, from buying to marketing, is in our guide to multi-venue operations.
What to make centrally and what to finish on site
The decision for each item comes down to four questions. Does it take a lot of labour? Is the recipe stable? Does it travel and hold well chilled? Does making it in larger batches improve it, or at least not harm it? Items that answer yes to all four belong in the central kitchen.
Good candidates:
- Stocks, sauces, gravies and dressings.
- Doughs, pastry, batters and bases.
- Braises, slow-cooked meats and anything that improves or holds after cooking.
- Butchery, portioning and marinating.
- Soups, purées, compotes and other cooked fruit and vegetables that hold well.
- Desserts that are made ahead anyway: set creams, cakes, biscuits, ice cream bases.
Items better left to the site:
- Anything fried, grilled or seared to order.
- Dressed salads, cut herbs and garnishes that wilt.
- Eggs cooked to order, fresh pasta finished in the pan, and anything whose texture fails within minutes.
- Plating and the final seasoning, which is where the site chef's judgement still matters.
Between the two sits a grey area: items that could be made either way. Start by keeping them on site, and move them only when the central kitchen has proved it can deliver the core items reliably. A central kitchen that tries to make everything in its first month usually makes nothing well.
The kitchen production plan
The central kitchen does not cook to orders as they arrive. It cooks to a plan, and the plan starts with what the venues expect to sell.
Build the kitchen production plan in four steps:
- Forecast covers and dish sales for each venue for the coming days. Our guides to sales forecasting and to a covers forecast the kitchen will believe show how to do it in twenty minutes from your own history.
- Turn dish forecasts into component quantities. If a venue expects to sell 120 portions of a braised dish over three days, and each portion uses 180 grams of braise, it needs about 21.6 kilograms, plus whatever buffer you hold.
- Set a par for each component at each venue: the amount it should hold at the start of each day. Production tops each venue back up to par rather than guessing afresh every day. Our guide to par levels explains how to set them.
- Combine the three venues' needs into batch sheets: what to make, in what quantity, in what order, on which day, given shelf life and equipment.
The plan should run several days ahead for long-cook and long-life items, and a day ahead for items with a short shelf life. Review it daily against what the venues actually used, because a forecast that is never checked becomes a habit, not a plan.
At each venue, the same thinking runs one level down, in the daily prep list. Our guide to the prep list that ends the morning guesswork covers how a site kitchen plans the finishing work once the central kitchen's deliveries arrive.
Internal ordering between the kitchens
Internal ordering is how each venue tells the central kitchen what it needs. Without a clear system, the central kitchen hears requests by phone, text and shouted message, and production becomes reactive.
A workable system has a few firm rules:
- One way to order. A shared order sheet, a form or an ordering tool, but only one, and nothing made that is not on it.
- A cut-off time. Orders for tomorrow's delivery close at a fixed hour today, so the production plan can be finalised and the batches started.
- Standing orders for the steady items. Most components are needed every day in similar quantities; set them as a standing order, adjusted to par, and let the venues change only the exceptions.
- A process for the emergency. A venue that runs out mid-service needs a way to get more, but it should be the exception, recorded and reviewed, not the routine.
Track two figures from the start: how often orders arrive after the cut-off, and how often an emergency top-up is needed. Both tell you whether the forecasting and the pars are working.
Transfers: moving food and moving value
Every delivery from the central kitchen to a venue is a transfer. It moves food, and it moves value: stock leaves one kitchen's books and arrives in another's. Both sides of that need recording.
On the food side, each delivery needs a delivery note listing what was sent, in what quantity, with batch numbers or production dates, and use-by dates. The venue checks the delivery against the note on arrival, records the temperature of chilled items, and signs. Any shortfall or rejected item is noted there and then.
On the value side, each item has a transfer price, and the delivery note's total is what the venue is charged. Without transfer prices, the central kitchen's costs sit in one place and the venues' food cost percentages look artificially low, or the costs are spread by guesswork at the end of the month. With them, each venue's food cost reflects what it actually used.
Count transfers in stock counts too. Food that has left the central kitchen but has not been recorded as arriving at a venue is the commonest reason for a group's combined stock figures not adding up. Our guide to running a stock count properly covers the counting itself.
Central kitchen costing: what a transfer is worth
Central kitchen costing has two jobs. It tells each venue what its food really costs, and it tells the group whether the central kitchen is earning its keep.
Start with the recipe cost of each batch: every ingredient at its purchase price, divided by the yield of the batch, gives a cost per kilogram or per portion. Our guide to recipe costing walks through yields and trim losses.
Then decide what the transfer price includes. There are three common choices:
- Ingredient cost only. Simple, and it keeps venue food costs comparable with what they were before the central kitchen opened. The central kitchen's labour and overheads then sit in a separate cost centre.
- Ingredient cost plus a share of the central kitchen's running costs. Each venue's figures then show the full cost of its food, and the central kitchen breaks even on paper by design.
- A set transfer price, reviewed periodically. Easy for the venues to plan around, but it hides changes in ingredient prices until the next review.
An example, with invented figures. A batch of braise uses ingredients costing 96 and yields 12 kilograms, so the ingredient cost is 8 a kilogram. If the central kitchen's labour and running costs come to an example 1,200 a week, and it produces 600 kilograms a week across all items, those costs add 2 a kilogram. The transfer price is 8 at ingredient cost or 10 at full cost.
Whichever method you choose, use it consistently, and make sure everybody reading a venue's food cost percentage knows which one it is. Our guide to calculating food cost percentage covers the rest of that calculation.
Food safety across two kitchens
A central kitchen extends the food safety chain. Food is cooked in one place, cooled, stored, transported, stored again and reheated or finished in another. Each of those steps is a point where things can go wrong, and each needs a control.
Your food safety management system, based on HACCP principles, should cover at least:
- Cooling: how quickly cooked food is brought down to chilled temperatures, and how that is checked and recorded. Cook-chill only works if the chill is fast.
- Labelling: every container labelled with what it is, the production date, the use-by date and the allergens it contains.
- Transport: chilled food kept chilled in transit, in suitable containers or a refrigerated vehicle, with temperatures checked on arrival.
- Reheating and finishing at the venue, to the temperatures your system sets.
- Allergen information that travels with the food. A sauce made centrally must arrive at the venue with its ingredients and allergens recorded, so the venue's allergen information stays correct. Our guide to an allergen matrix that stays correct covers how to keep it that way.
In the UK, the Food Standards Agency's guidance on food safety management systems explains what such a system needs to show. The general principles of cook-chill production are summarised in Wikipedia's article on cook-chill, but your own procedures must be built for your own food and premises.
Registration and approval
A central kitchen is a food business in its own right and must be registered with the local authority like any other. Depending on what it makes and who it supplies, it may also need approval before it starts.
In England, Wales and Northern Ireland, some establishments that handle products of animal origin, such as meat products and some meat preparations, and supply them to other businesses, need approval from their local authority rather than just registration. Whether that applies to a kitchen supplying your own venues depends on what it makes, in what quantities and how it supplies them. The Food Standards Agency's page on applying for approval of a food establishment lists the establishments concerned. Talk to your local authority's food team early, before the kitchen is fitted out, because approval can affect the layout. Elsewhere, check the rules where you trade.
Logistics: the van matters as much as the oven
A central kitchen is only as good as its deliveries. Plan them as carefully as the production.
- Delivery windows that suit the venues. Food arriving in the middle of lunch service is food nobody has time to check in.
- Routes and timing. Three venues might be served by one van in one loop; write the loop down and time it.
- Containers that stack, seal and clean easily, in sizes the venues' fridges can take, with a way to get them back.
- A clear owner for the delivery, who signs it out at the central kitchen and gets it signed in at the venue.
- A plan for the day the van breaks down.
Start with one delivery a day. A second daily run is a solution for a specific problem, such as short-life items or a lunch rush, not a starting point.
The people side
A central kitchen changes jobs. The site chefs no longer make their own stocks and sauces, and some of them will feel that the craft has been taken from them. The central kitchen team cooks food it never sees served. Both groups need to understand why the change is being made and what it gives them.
A few practices help:
- Involve the site chefs in setting the recipes the central kitchen makes. Food made to their standard is food they will defend.
- Rotate people between the central kitchen and the sites where you can, so each side understands the other's day.
- Share feedback from the sites with the production team, good and bad, every week.
- Give the site chefs the time back. If the central kitchen saves each venue three hours a day, spend some of it on things the chefs care about, such as specials and training.
Measuring whether it works
Pick a small number of figures and review them every week, from the first week:
- Order accuracy: the share of deliveries that arrived complete and correct.
- On-time delivery: the share of deliveries inside their window.
- Waste: what the central kitchen discarded, and what the venues discarded from its deliveries. Our guide to reducing food waste covers how to record it.
- Yield: what each batch produced against its recipe.
- Food cost percentage at each venue, on a consistent transfer price.
- Labour hours at the sites and in the central kitchen, together.
The last two matter most. The point of the central kitchen is lower total cost, or more capacity at the same cost. If combined labour and food cost have not moved after a few months, find out why before expanding it.
Mistakes that sink central kitchens
- Opening one to solve a problem that a better prep list at each site would have solved.
- Moving too much at once, so nothing is made well in the first month.
- No cut-off for internal ordering, so production chases phone calls.
- No transfer prices, so nobody knows what each venue's food actually costs.
- Treating transport as an afterthought.
- Allergen information that does not travel with the food.
- Ignoring the site chefs until they leave.
Where servearound fits
A central kitchen is mostly a production and logistics problem, and the production plan, the transfers and the costings stay in your own system today. servearound helps with the parts that start at the venues.
Each venue in a group sits under one business in servearound, with a network dashboard across all of them. The menu report in Analytics shows units sold for every dish at each venue over any range of dates, which is the history behind a dish forecast and therefore behind the kitchen production plan. At each venue, orders from the point of sale go to the kitchen display by station and course, so the finishing work on site runs from the same tickets every time.
servearound does not plan production, take internal orders between kitchens, record transfers or hold recipe costs today. Inventory tracking, for the stock behind the menu, is coming. To see how a group of venues runs on servearound, look at pricing or get in touch.
Questions operators ask
How many venues do you need before a central kitchen makes sense?
There is no fixed number. Some groups make it work with two venues close together and a shared menu; others with five venues and different concepts never do. Work out the labour saved, the waste and buying gains, and the costs of premises, transport and people for your own group before deciding.
What is the difference between a central kitchen and a commissary kitchen?
In everyday use, nothing much. Both describe a kitchen that prepares food for consumption elsewhere. Some people use commissary kitchen for shared or rented production space, and central kitchen for a group's own.
What should a central kitchen make first?
The items that are labour-heavy, stable, travel well and are used at every venue: stocks, sauces, doughs and braises are the usual start. Add more only when those arrive reliably.
How should we price food transferred to the venues?
Choose ingredient cost only, ingredient cost plus a share of the central kitchen's costs, or a set price reviewed periodically, and apply it consistently. The important thing is that each venue's food cost reflects what it used and that everybody knows which method is in use.
Does a central kitchen need its own food safety system?
Yes. It is a food business in its own right, and its system must cover cooling, labelling, transport and allergen information as well as cooking. It must also be registered, and depending on what it makes and supplies, it may need approval.
How far ahead should the production plan run?
Several days for long-cook and long-life items, a day ahead for anything with a short shelf life. Review it daily against what the venues actually used.
Will a central kitchen reduce our food cost percentage?
It can, through less waste and better buying, but only if transfers are priced and recorded. Without transfer prices, the venues' figures may look better while the group's total cost has not changed at all.
What is the most common reason central kitchens fail?
Underestimating logistics and ordering. The cooking is rarely the problem. Late orders, missed deliveries and food that arrives without labels or allergen information are what make site teams lose faith in it.
The short version
A central kitchen makes stocks, sauces, doughs, braises and portioned items for several venues, which finish and plate them on site. It pays when labour savings, less waste, better buying, consistency and room to grow outweigh the premises, transport and extra food safety work, and labour savings alone rarely do it. Work out those sums for your own group, with the optimism taken out.
If you go ahead, make centrally only what is labour-heavy, stable and travels well, and leave texture-sensitive cooking to the sites. Run a kitchen production plan from each venue's forecast and pars, take internal orders one way with a firm cut-off, record every transfer with a transfer price, and keep the food safety chain intact from cooling to reheating, with allergens recorded all the way. Measure accuracy, waste and combined cost from the first week.
Written byThe servearound team
In this guide

Inventory, food cost & waste
Prep from forecast, not from yesterday's prep
How to set tomorrow's prep from bookings, the menu mix, the weather and last year, instead of copying yesterday, and the two dishes where forecasting always loses.

Inventory, food cost & waste
The prep list that ends the morning guesswork
Build the prep list from tonight's bookings rather than yesterday's habit: prep pars per cover, a production order, batch sizes that fit the night, and a clear owner at eight in the morning.
Keep reading

Inventory, food cost & waste
Stock count accuracy: six ways a count goes wrong
Units in cases, half-used containers, a forgotten prep fridge, uncounted sauces, deliveries mid-count and a count finished at midnight by one tired person: six ways a stock count goes wrong.

Inventory, food cost & waste
A costing audit for your twenty best sellers
A half-day exercise: re-cost the twenty dishes that carry your menu, find the two or three that have quietly lost margin since they were priced, and decide what to do about each.